07477 302745 Get a quote

Conversions

Garages: planning and building regs.

Short answer: planning permission usually not, building regulations normally yes.

A garage converted into an office

Planning permission.

Planning permission isn't usually required, providing the work is internal and doesn't enlarge the building. Permission may be needed if it becomes a separate house, and permitted development rights have sometimes been removed, especially on newer estates and in conservation areas.

Check with your local planning authority. In Wigan, the council offers a lawful development certificate if you're unsure.

Building regulations.

  • The floor. A damp proof membrane and insulation. Often the simplest answer is upgrading the existing concrete.
  • The new wall. The old threshold is unlikely to have been designed to carry a wall, so a new foundation may be needed, down to undisturbed ground.
  • Insulation. New walls and floors should reach 0.18 W/m²K, windows 1.4 W/m²K.
  • Fire. If part stays as a garage, you need fire separation, and any door in that wall should be fire-resisting and self-closing.

Which route?

Wigan lists garage conversions as an example of minor work suited to a building notice, and says a full plans application is more cost effective.

Do I need building regulations for a garage conversion?

Yes, normally.

Do I need planning permission?

Usually not, if the work is internal and doesn't enlarge the building.

Ready when you are

Tell us about the job. We'll come and have a look.