07477 302745 Get a quote

Flooring

Flooring, laid properly.

A good floor is mostly about what's underneath it. Get the subfloor level and dry first, and whatever you lay on top will look right and stay right.

An oak herringbone floor in a hallway
One of our floors
For
Worn floors, new rooms, whole houses
Rules
A new finish needs no approval
Key check
Moisture
Time
About half a day for one room

How it works.

  1. Check what's there. Lift a corner and see. HSE warns that old asbestos floor tiles can be hidden under carpets.
  2. Check for moisture. Limits vary by product, so we follow the manufacturer's instructions.
  3. Prepare the subfloor. Repair, level or screed as needed.
  4. Acclimatise and lay. Again, to the manufacturer's instructions for that product.
  5. Finish. Trims, thresholds and skirting details. Internal doors may need trimming.
Don't block air bricks to stop draughts. The Energy Saving Trust says they're needed to ventilate the space under your floor and stop your floorboards rotting.

Not sure what to choose? Read laminate, LVT or wood: which room?

We supply and fit laminate, LVT, engineered wood, solid wood and herringbone floors.

Questions we get asked.

Do I need building regs to replace flooring?

Not for a new finish. Replacing the structure of a ground floor, such as a screed or timber deck, can be different.

Do I have to insulate a ground floor when I replace it?

Sometimes. Sources quote different percentages, so check with building control.

Could my old floor tiles contain asbestos?

They could, in a building built or refurbished before 2000. Don't break or remove them until they're checked.

How long before I can lay flooring on new screed?

Quick-Step's rule of thumb is one week per cm up to 4cm, and always measure moisture.

Can I put a hard floor in my flat?

Check your lease first. You could be asked to take it up if it wasn't allowed.

Sources
  1. GOV.UK, When you do not need approval
  2. Planning Portal, Floor insulation
  3. Building Regulations 2010, regulation 23
  4. Energy Saving Trust, Floor insulation
  5. HSE, Locations of asbestos
  6. Forbo Flooring, Technical FAQ
  7. Quick-Step, Laying laminate on fresh screed
  8. Basingstoke and Deane Council, Laminate and wood flooring noise

Recent floors

Ready when you are

Tell us about the job. We'll come and have a look.

Concept V2 by My Wix Designer